The Watt Mix
live · 10:45 CET
PLEN
Gas unit

CZN_1S01

plant: EC Czechnica-2 · operator: PGE Energia Ciepła
Power now
80 MW
Load
47% of 180 MW
Running without a break
27 days, since 22 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 180 MW
now 80 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,600 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
88.6%
Outages in total
34 days
StartEndLengthLabel
14 Sep 2026 00:3016 Sep 2026 13:152 days
6 Sep 2026 12:457 Sep 2026 14:151 day
15 Aug 2026 06:3016 Aug 2026 10:301 day
28 Jun 2026 04:3021 Jul 2026 14:0023 dayslonger outage
31 May 2026 07:151 Jun 2026 09:451 day
28 Jan 2026 16:3030 Jan 2026 12:451 day
12 Dec 2025 11:1515 Dec 2025 00:302 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.