Power now
80 MW
Load
47% of 180 MW
Running without a break
27 days, since 22 Oct 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 180 MW
now 80 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 30 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | CZN_1S01 |
|---|---|
| 18 Nov 2026 | 73% |
| 17 Nov 2026 | 83% |
| 16 Nov 2026 | 73% |
| 15 Nov 2026 | 64% |
| 14 Nov 2026 | 91% |
| 13 Nov 2026 | 82% |
| 12 Nov 2026 | 85% |
| 11 Nov 2026 | 55% |
| 10 Nov 2026 | 48% |
| 9 Nov 2026 | 81% |
| 8 Nov 2026 | 94% |
| 7 Nov 2026 | 90% |
| 6 Nov 2026 | 90% |
| 5 Nov 2026 | 85% |
| 4 Nov 2026 | 77% |
| 3 Nov 2026 | 87% |
| 2 Nov 2026 | 90% |
| 1 Nov 2026 | 84% |
| 31 Oct 2026 | 75% |
| 30 Oct 2026 | 82% |
| 29 Oct 2026 | 89% |
| 28 Oct 2026 | 87% |
| 27 Oct 2026 | 83% |
| 26 Oct 2026 | 82% |
| 25 Oct 2026 | 71% |
| 24 Oct 2026 | 78% |
| 23 Oct 2026 | 47% |
| 22 Oct 2026 | 46% |
| 21 Oct 2026 | 43% |
| 20 Oct 2026 | 67% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,600 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
88.6%
Outages in total
34 days
| Start | End | Length | Label |
|---|---|---|---|
| 14 Sep 2026 00:30 | 16 Sep 2026 13:15 | 2 days | |
| 6 Sep 2026 12:45 | 7 Sep 2026 14:15 | 1 day | |
| 15 Aug 2026 06:30 | 16 Aug 2026 10:30 | 1 day | |
| 28 Jun 2026 04:30 | 21 Jul 2026 14:00 | 23 days | longer outage |
| 31 May 2026 07:15 | 1 Jun 2026 09:45 | 1 day | |
| 28 Jan 2026 16:30 | 30 Jan 2026 12:45 | 1 day | |
| 12 Dec 2025 11:15 | 15 Dec 2025 00:30 | 2 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.