live · 10:45 CET
PLEN
Hard coal unit

LD4 1-03

plant: EC Łódź-4 · operator: Veolia Energia Łódź
Power now
60 MW
Load
73% of 90 MW
Running without a break
18 days, since 30 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 90 MW
now 60 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 19 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,900 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
49.7%
Outages in total
183 days
StartEndLengthLabel
15 Oct 2026 04:3030 Oct 2026 21:0015 dayslonger outage
26 Sep 2026 16:456 Oct 2026 04:009 days
22 Jul 2026 11:157 Sep 2026 19:3047 dayslong outage
30 Jun 2026 22:3019 Jul 2026 03:3018 dayslonger outage
20 Jun 2026 06:4530 Jun 2026 15:3010 days
3 Apr 2026 06:1516 Jun 2026 00:0073 daysvery long outage
6 Feb 2026 22:158 Feb 2026 00:151 day
20 Jan 2026 12:0024 Jan 2026 05:003 days
21 Dec 2025 23:0023 Dec 2025 23:452 days
8 Dec 2025 04:159 Dec 2025 18:301 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.