Gas unit

ENS_1S01

Power now
0 MW
Load
0% of 130 MW
Not running
13 h, since yesterday 21:15

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 130 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 4 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or moreno data

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,500 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
43.0%
Outages in total
4 days
StartEndLengthLabel
12 Nov 2026 23:0017 Nov 2026 05:004 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.