The Watt Mix
live · 10:45 CET
PLEN
Gas unit

REC 1-01

plant: EC Rzeszów · operator: PGE Energia Ciepła
Power now
70 MW
Load
68% of 100 MW
Running without a break
21 days, since 27 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 100 MW
now 70 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 24 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,900 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
43.2%
Outages in total
206 days
StartEndLengthLabel
22 Oct 2026 23:0027 Oct 2026 12:154 days
18 Aug 2026 20:1522 Oct 2026 02:1564 daysvery long outage
6 Aug 2026 23:0018 Aug 2026 12:4511 days
4 Aug 2026 20:306 Aug 2026 13:301 day
20 Jul 2026 10:303 Aug 2026 13:3014 dayslonger outage
1 Apr 2026 10:1520 Jul 2026 03:45109 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.