The Watt Mix
live · 10:45 CET
PLEN
Gas unit

STW42S12

plant: EC Stalowa Wola · operator: Tauron i Orlen (spółka ECSW)
Power now
230 MW
Load
52% of 440 MW
Running without a break
1 day, since yesterday 02:00

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 440 MW
now 230 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 26 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 6,700 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
81.8%
Outages in total
64 days
StartEndLengthLabel
13 Nov 2026 00:1517 Nov 2026 02:004 days
3 Oct 2026 00:3010 Oct 2026 12:157 days
18 Sep 2026 22:4521 Sep 2026 12:002 days
31 Aug 2026 08:3016 Sep 2026 03:3015 dayslonger outage
4 Aug 2026 19:308 Aug 2026 19:454 days
30 Jul 2026 00:454 Aug 2026 15:005 days
22 Jul 2026 04:1526 Jul 2026 14:004 days
23 May 2026 00:152 Jun 2026 16:1510 days
1 May 2026 00:1510 May 2026 20:009 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.