Power now
230 MW
Load
52% of 440 MW
Running without a break
1 day, since yesterday 02:00
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 440 MW
now 230 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 26 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | STW42S12 |
|---|---|
| 18 Nov 2026 | 58% |
| 17 Nov 2026 | 63% |
| 16 Nov 2026 | stopped |
| 15 Nov 2026 | stopped |
| 14 Nov 2026 | stopped |
| 13 Nov 2026 | stopped |
| 12 Nov 2026 | 76% |
| 11 Nov 2026 | 88% |
| 10 Nov 2026 | 88% |
| 9 Nov 2026 | 88% |
| 8 Nov 2026 | 76% |
| 7 Nov 2026 | 78% |
| 6 Nov 2026 | 80% |
| 5 Nov 2026 | 73% |
| 4 Nov 2026 | 78% |
| 3 Nov 2026 | 80% |
| 2 Nov 2026 | 81% |
| 1 Nov 2026 | 70% |
| 31 Oct 2026 | 74% |
| 30 Oct 2026 | 80% |
| 29 Oct 2026 | 79% |
| 28 Oct 2026 | 75% |
| 27 Oct 2026 | 68% |
| 26 Oct 2026 | 70% |
| 25 Oct 2026 | 60% |
| 24 Oct 2026 | 66% |
| 23 Oct 2026 | 63% |
| 22 Oct 2026 | 69% |
| 21 Oct 2026 | 69% |
| 20 Oct 2026 | 71% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 6,700 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
81.8%
Outages in total
64 days
| Start | End | Length | Label |
|---|---|---|---|
| 13 Nov 2026 00:15 | 17 Nov 2026 02:00 | 4 days | |
| 3 Oct 2026 00:30 | 10 Oct 2026 12:15 | 7 days | |
| 18 Sep 2026 22:45 | 21 Sep 2026 12:00 | 2 days | |
| 31 Aug 2026 08:30 | 16 Sep 2026 03:30 | 15 days | longer outage |
| 4 Aug 2026 19:30 | 8 Aug 2026 19:45 | 4 days | |
| 30 Jul 2026 00:45 | 4 Aug 2026 15:00 | 5 days | |
| 22 Jul 2026 04:15 | 26 Jul 2026 14:00 | 4 days | |
| 23 May 2026 00:15 | 2 Jun 2026 16:15 | 10 days | |
| 1 May 2026 00:15 | 10 May 2026 20:00 | 9 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.