The Watt Mix
live · 10:45 CET
PLEN
Gas unit

LEC_1S01

plant: EC Wrotków · operator: PGE Energia Ciepła
Power now
100 MW
Load
45% of 230 MW
Running without a break
9 days, since 8 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 230 MW
now 100 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 28 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 3,600 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
78.6%
Outages in total
10 days
StartEndLengthLabel
23 Oct 2026 20:4526 Oct 2026 13:002 days
9 Oct 2026 22:0012 Oct 2026 13:002 days
before 1 Oct 2026 00:005 Oct 2026 14:15at least 4 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.