Gas unit

WZE22S20

plant: EC Żerań 2 · operator: Orlen Termika
Power now
0 MW
Load
0% of 490 MW
Not running
190 days, since 12 May 2026
very long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 490 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
46.3%
Outages in total
193 days
StartEndLengthLabel
12 May 2026 02:45ongoing 190 daysvery long outage
5 May 2026 10:456 May 2026 14:451 day
24 Jan 2026 05:0025 Jan 2026 20:301 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.