Wind farm unit

DUN_1-01

plant: FW Dunowo
Power now
110 MW
Load
100% of 110 MW
Running without a break
19 h, since yesterday 15:30

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 110 MW
now 110 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 3 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or moreno data

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,300 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
94.9%
Outages in total
0 days
No outages lasting at least a day in the data from the last 12 months.
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.