The Watt Mix
live · 10:45 CET
PLEN
Wind farm unit

PTW_1P01

Power now
40 MW
Load
66% of 70 MW
Running without a break
1 day, since at least yesterday 00:00

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 70 MW
now 40 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 2 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or moreno data

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 940 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
100.0%
Outages in total
0 days
No outages lasting at least a day in the data from the last 12 months.
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.