The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

JW2_4S07

plant: Jaworzno 2 JWCD · operator: Tauron Wytwarzanie
Power now
530 MW
Load
64% of 840 MW
Running without a break
32 days, since 17 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 840 MW
now 530 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 16,800 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
65.0%
Outages in total
98 days
StartEndLengthLabel
6 Jul 2026 00:0029 Sep 2026 09:1585 daysvery long outage
18 Jun 2026 10:4524 Jun 2026 06:305 days
30 May 2026 00:003 Jun 2026 11:154 days
2 May 2026 10:004 May 2026 16:002 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.