Power now
60 MW
Load
71% of 90 MW
Running without a break
8 days, since 9 Nov 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 90 MW
now 60 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 22 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | KAR_1S02 |
|---|---|
| 18 Nov 2026 | 71% |
| 17 Nov 2026 | 91% |
| 16 Nov 2026 | 82% |
| 15 Nov 2026 | 52% |
| 14 Nov 2026 | 84% |
| 13 Nov 2026 | 86% |
| 12 Nov 2026 | 81% |
| 11 Nov 2026 | 82% |
| 10 Nov 2026 | 76% |
| 9 Nov 2026 | stopped |
| 8 Nov 2026 | stopped |
| 7 Nov 2026 | stopped |
| 6 Nov 2026 | stopped |
| 5 Nov 2026 | 33% |
| 4 Nov 2026 | 60% |
| 3 Nov 2026 | 65% |
| 2 Nov 2026 | 74% |
| 1 Nov 2026 | 68% |
| 31 Oct 2026 | 50% |
| 30 Oct 2026 | 23% |
| 29 Oct 2026 | stopped |
| 28 Oct 2026 | stopped |
| 27 Oct 2026 | stopped |
| 26 Oct 2026 | stopped |
| 25 Oct 2026 | 34% |
| 24 Oct 2026 | 64% |
| 23 Oct 2026 | 71% |
| 22 Oct 2026 | 64% |
| 21 Oct 2026 | 62% |
| 20 Oct 2026 | 76% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,000 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
28.6%
Outages in total
228 days
| Start | End | Length | Label |
|---|---|---|---|
| 5 Nov 2026 16:00 | 9 Nov 2026 23:45 | 4 days | |
| 25 Oct 2026 16:15 | 30 Oct 2026 09:00 | 4 days | |
| 21 Sep 2026 03:15 | 7 Oct 2026 00:15 | 15 days | longer outage |
| 2 Sep 2026 10:30 | 19 Sep 2026 13:00 | 17 days | longer outage |
| 7 Aug 2026 10:45 | 1 Sep 2026 18:30 | 25 days | longer outage |
| 9 May 2026 02:15 | 5 Aug 2026 12:15 | 88 days | very long outage |
| 2 Apr 2026 13:00 | 8 May 2026 05:00 | 35 days | long outage |
| 27 Feb 2026 11:00 | 29 Mar 2026 00:45 | 29 days | longer outage |
| 30 Jan 2026 10:00 | 2 Feb 2026 19:00 | 3 days | |
| 9 Jan 2026 16:15 | 13 Jan 2026 04:00 | 3 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.