The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KAR_1S02

plant: Karolin 2 · operator: Veolia Energia Poznań
Power now
60 MW
Load
71% of 90 MW
Running without a break
8 days, since 9 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 90 MW
now 60 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 22 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,000 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
28.6%
Outages in total
228 days
StartEndLengthLabel
5 Nov 2026 16:009 Nov 2026 23:454 days
25 Oct 2026 16:1530 Oct 2026 09:004 days
21 Sep 2026 03:157 Oct 2026 00:1515 dayslonger outage
2 Sep 2026 10:3019 Sep 2026 13:0017 dayslonger outage
7 Aug 2026 10:451 Sep 2026 18:3025 dayslonger outage
9 May 2026 02:155 Aug 2026 12:1588 daysvery long outage
2 Apr 2026 13:008 May 2026 05:0035 dayslong outage
27 Feb 2026 11:0029 Mar 2026 00:4529 dayslonger outage
30 Jan 2026 10:002 Feb 2026 19:003 days
9 Jan 2026 16:1513 Jan 2026 04:003 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.