The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KAT_1S01

plant: Katowice · operator: Tauron Ciepło
Power now
100 MW
Load
85% of 110 MW
Running without a break
49 days, since 30 Sep 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 110 MW
now 100 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,200 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
52.6%
Outages in total
128 days
StartEndLengthLabel
4 Sep 2026 15:4530 Sep 2026 04:0025 dayslonger outage
27 Jun 2026 01:001 Sep 2026 07:0066 daysvery long outage
23 May 2026 00:0024 Jun 2026 15:4532 dayslong outage
17 Mar 2026 14:0021 Mar 2026 10:453 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.