plant: MFW Baltic Power · operator: Orlen i Northland Power
Power now
50 MW
Load
8% of 670 MW
Running without a break
6 days, since 11 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 670 MW
now 50 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 10,300 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
79.8%
Outages in total
6 days
StartEndLengthLabel
24 Aug 2026 11:3025 Aug 2026 20:151 day
19 Aug 2026 04:1520 Aug 2026 19:451 day
12 Aug 2026 14:4514 Aug 2026 05:451 day
15 Jul 2026 12:0017 Jul 2026 01:001 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.