The Watt Mix
live · 10:45 CET
PLEN
Gas unit

PLO_4S01

plant: Płock · operator: Orlen
Power now
250 MW
Load
43% of 580 MW
Running without a break
22 days, since 27 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 580 MW
now 250 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 27 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 8,900 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
93.7%
Outages in total
23 days
StartEndLengthLabel
23 Oct 2026 23:0027 Oct 2026 10:003 days
19 Jun 2026 22:4522 Jun 2026 11:302 days
11 Jan 2026 15:3028 Jan 2026 12:4516 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.