Power now
250 MW
Load
43% of 580 MW
Running without a break
22 days, since 27 Oct 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 580 MW
now 250 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 27 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | PLO_4S01 |
|---|---|
| 18 Nov 2026 | 48% |
| 17 Nov 2026 | 64% |
| 16 Nov 2026 | 52% |
| 15 Nov 2026 | 46% |
| 14 Nov 2026 | 50% |
| 13 Nov 2026 | 49% |
| 12 Nov 2026 | 66% |
| 11 Nov 2026 | 79% |
| 10 Nov 2026 | 79% |
| 9 Nov 2026 | 81% |
| 8 Nov 2026 | 73% |
| 7 Nov 2026 | 73% |
| 6 Nov 2026 | 69% |
| 5 Nov 2026 | 64% |
| 4 Nov 2026 | 69% |
| 3 Nov 2026 | 72% |
| 2 Nov 2026 | 62% |
| 1 Nov 2026 | 56% |
| 31 Oct 2026 | 62% |
| 30 Oct 2026 | 67% |
| 29 Oct 2026 | 67% |
| 28 Oct 2026 | 67% |
| 27 Oct 2026 | 22% |
| 26 Oct 2026 | stopped |
| 25 Oct 2026 | stopped |
| 24 Oct 2026 | stopped |
| 23 Oct 2026 | 55% |
| 22 Oct 2026 | 55% |
| 21 Oct 2026 | 54% |
| 20 Oct 2026 | 64% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 8,900 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
93.7%
Outages in total
23 days
| Start | End | Length | Label |
|---|---|---|---|
| 23 Oct 2026 23:00 | 27 Oct 2026 10:00 | 3 days | |
| 19 Jun 2026 22:45 | 22 Jun 2026 11:30 | 2 days | |
| 11 Jan 2026 15:30 | 28 Jan 2026 12:45 | 16 days | long outage |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.