PLEN
Gas unit

ZGR22S01

plant: Zielona Góra · operator: PGE Energia Ciepła
Power now
200 MW
Load
98% of 200 MW
Running without a break
72 days, since 6 Sep 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 200 MW
now 200 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,700 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
87.3%
Outages in total
45 days
StartEndLengthLabel
4 Sep 2026 23:006 Sep 2026 12:451 day
14 May 2026 20:0026 Jun 2026 18:3042 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.