Solar farm

Zwartowo

Zwartowo, commune of Choczewo (Pomeranian Voivodeship) · operator: Goldbeck Solar
Power now
0 MW
Units running
0 of 1
Share of Poland's generation now
0.0%

1 unit not running

Shortest stop first. A label appears from 7 days.
ZWA_1P03since 15 Nov 20262 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

About the plant

A solar farm of around 204 MWp, one of the largest in Poland. Since 2026 it has participated in the balancing market.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.