Combined-cycle gas power plant
EC Włocławek
Włocławek (Kuyavian-Pomeranian Voivodeship) · operator: Orlen
Power now
150 MW
Units running
1 of 1
Share of Poland's generation now
0.7%
1 unit running
Output at 10:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
Archived units
Units PSE no longer reports, for example under a former code.
WLC_2-01last data 31 May 2025
Operating history
The selected period applies to both charts below: 20 Oct – 18 Nov 2026
Which units ran and when
One cell is one day. Days in operation during the period are on the right.
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | WLC_2S01 |
|---|---|
| 18 Nov 2026 | 38% |
| 17 Nov 2026 | 57% |
| 16 Nov 2026 | 41% |
| 15 Nov 2026 | 33% |
| 14 Nov 2026 | 36% |
| 13 Nov 2026 | 35% |
| 12 Nov 2026 | 62% |
| 11 Nov 2026 | 90% |
| 10 Nov 2026 | 88% |
| 9 Nov 2026 | 90% |
| 8 Nov 2026 | 74% |
| 7 Nov 2026 | 74% |
| 6 Nov 2026 | 70% |
| 5 Nov 2026 | 61% |
| 4 Nov 2026 | 70% |
| 3 Nov 2026 | 73% |
| 2 Nov 2026 | 60% |
| 1 Nov 2026 | 45% |
| 31 Oct 2026 | 52% |
| 30 Oct 2026 | 64% |
| 29 Oct 2026 | 62% |
| 28 Oct 2026 | 63% |
| 27 Oct 2026 | 42% |
| 26 Oct 2026 | 41% |
| 25 Oct 2026 | 37% |
| 24 Oct 2026 | 43% |
| 23 Oct 2026 | 42% |
| 22 Oct 2026 | 36% |
| 21 Oct 2026 | 41% |
| 20 Oct 2026 | 57% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 6,300 MWh
Day profile
Tuesday 17 Nov 2026, MW
About the plant
A combined-cycle gas turbine (CCGT) unit of around 463 MWe next to the Anwil works, commissioned in 2017.
The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.