Gas unit

WLC_2S01

plant: EC Włocławek · operator: Orlen
Power now
150 MW
Load
33% of 460 MW
Running without a break
57 days, since 21 Sep 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 460 MW
now 150 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 6,300 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
96.4%
Outages in total
13 days
StartEndLengthLabel
12 Sep 2026 07:4515 Sep 2026 09:303 days
7 Mar 2026 00:0016 Mar 2026 11:309 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.