Archived data: PSE has not reported this unit since 26 Feb 2026
Operating history
The selected period applies to the operating strip and daily energy: 28 Jan – 26 Feb 2026
Operation and stops
In operation on 30 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | LEC 1-01 |
|---|---|
| 26 Feb 2026 | 89% |
| 25 Feb 2026 | 97% |
| 24 Feb 2026 | 94% |
| 23 Feb 2026 | 82% |
| 22 Feb 2026 | 76% |
| 21 Feb 2026 | 93% |
| 20 Feb 2026 | 97% |
| 19 Feb 2026 | 97% |
| 18 Feb 2026 | 97% |
| 17 Feb 2026 | 97% |
| 16 Feb 2026 | 97% |
| 15 Feb 2026 | 97% |
| 14 Feb 2026 | 97% |
| 13 Feb 2026 | 96% |
| 12 Feb 2026 | 97% |
| 11 Feb 2026 | 97% |
| 10 Feb 2026 | 97% |
| 9 Feb 2026 | 97% |
| 8 Feb 2026 | 97% |
| 7 Feb 2026 | 64% |
| 6 Feb 2026 | 97% |
| 5 Feb 2026 | 97% |
| 4 Feb 2026 | 97% |
| 3 Feb 2026 | 97% |
| 2 Feb 2026 | 97% |
| 1 Feb 2026 | 97% |
| 31 Jan 2026 | 97% |
| 30 Jan 2026 | 97% |
| 29 Jan 2026 | 97% |
| 28 Jan 2026 | 97% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Thursday 26 Feb 2026 · 2,800 MWh
Day profile
Thursday 26 Feb 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
99.8%
Outages in total
0 days
No outages lasting at least a day in the data from the last 12 months.
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.