The Watt Mix
live · 10:45 CET
PLEN
Wind farm

FW Miejska Górka

Power now
140 MW
Units running
1 of 1
Share of Poland's generation now
0.6%

1 unit running

Output at 10:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
MSG_2P01
140 MW
80% of 180 MW

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or moreno data

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,500 MWh

Day profile

Tuesday 17 Nov 2026, MW

About the plant

Wind farm. PSE reports 1 generating unit here; their highest output over the last 12 months adds up to about 180 MW.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.