Power now
140 MW
Load
80% of 180 MW
Running without a break
20 h, since yesterday 14:15
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 180 MW
now 140 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 2 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | MSG_2P01 |
|---|---|
| 18 Nov 2026 | 85% |
| 17 Nov 2026 | 36% |
| 16 Nov 2026 | – |
| 15 Nov 2026 | – |
| 14 Nov 2026 | – |
| 13 Nov 2026 | – |
| 12 Nov 2026 | – |
| 11 Nov 2026 | – |
| 10 Nov 2026 | – |
| 9 Nov 2026 | – |
| 8 Nov 2026 | – |
| 7 Nov 2026 | – |
| 6 Nov 2026 | – |
| 5 Nov 2026 | – |
| 4 Nov 2026 | – |
| 3 Nov 2026 | – |
| 2 Nov 2026 | – |
| 1 Nov 2026 | – |
| 31 Oct 2026 | – |
| 30 Oct 2026 | – |
| 29 Oct 2026 | – |
| 28 Oct 2026 | – |
| 27 Oct 2026 | – |
| 26 Oct 2026 | – |
| 25 Oct 2026 | – |
| 24 Oct 2026 | – |
| 23 Oct 2026 | – |
| 22 Oct 2026 | – |
| 21 Oct 2026 | – |
| 20 Oct 2026 | – |
stoppedrunning below 60% of max powerrunning at 60% or moreno data
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,500 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
90.7%
Outages in total
0 days
No outages lasting at least a day in the data from the last 12 months.
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.