live · 10:45 CET
PLEN
Gas unit

EGF_4S09

plant: Gryfino · operator: PGE Gryfino Dolna Odra
Power now
0 MW
Load
0% of 670 MW
Not running
28 days, since 20 Oct 2026
long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 670 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 1 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
61.4%
Outages in total
104 days
StartEndLengthLabel
20 Oct 2026 21:15ongoing 28 dayslong outage
7 Oct 2026 00:0014 Oct 2026 11:007 dayslonger outage
18 Sep 2026 23:0021 Sep 2026 21:452 days
3 Sep 2026 22:307 Sep 2026 00:003 days
27 Aug 2026 22:1531 Aug 2026 02:003 days
22 Aug 2026 07:1524 Aug 2026 14:002 days
22 Jul 2026 17:3028 Jul 2026 12:455 days
13 Jul 2026 09:1521 Jul 2026 12:458 dayslonger outage
11 Jul 2026 08:0012 Jul 2026 18:151 day
19 Jun 2026 21:4522 Jun 2026 17:002 days
30 May 2026 00:001 Jun 2026 13:302 days
28 Apr 2026 09:0029 Apr 2026 16:001 day
11 Apr 2026 22:0013 Apr 2026 03:151 day
6 Mar 2026 22:1528 Mar 2026 11:0021 dayslong outage
31 Jan 2026 14:153 Feb 2026 01:152 days
23 Dec 2025 22:152 Jan 2026 02:159 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.