Archived data: PSE has not reported this unit since 31 Dec 2025
Operating history
The selected period applies to the operating strip and daily energy: 2 Dec – 31 Dec 2025
Operation and stops
In operation on 16 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | KAR_1-02 |
|---|---|
| 31 Dec 2025 | stopped |
| 30 Dec 2025 | stopped |
| 29 Dec 2025 | stopped |
| 28 Dec 2025 | stopped |
| 27 Dec 2025 | stopped |
| 26 Dec 2025 | 71% |
| 25 Dec 2025 | 77% |
| 24 Dec 2025 | 86% |
| 23 Dec 2025 | 92% |
| 22 Dec 2025 | 90% |
| 21 Dec 2025 | 90% |
| 20 Dec 2025 | 90% |
| 19 Dec 2025 | 88% |
| 18 Dec 2025 | 90% |
| 17 Dec 2025 | 84% |
| 16 Dec 2025 | stopped |
| 15 Dec 2025 | stopped |
| 14 Dec 2025 | stopped |
| 13 Dec 2025 | stopped |
| 12 Dec 2025 | stopped |
| 11 Dec 2025 | stopped |
| 10 Dec 2025 | stopped |
| 9 Dec 2025 | stopped |
| 8 Dec 2025 | stopped |
| 7 Dec 2025 | 87% |
| 6 Dec 2025 | 94% |
| 5 Dec 2025 | 96% |
| 4 Dec 2025 | 84% |
| 3 Dec 2025 | 75% |
| 2 Dec 2025 | 71% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Wednesday 31 Dec 2025 · 0 MWh
Day profile
Wednesday 31 Dec 2025, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
62.5%
Outages in total
16 days
| Start | End | Length | Label |
|---|---|---|---|
| 27 Dec 2025 00:15 | at least until 1 Jan 2026 00:00 | at least 4 days | |
| 8 Dec 2025 02:00 | 17 Dec 2025 01:00 | 8 days | |
| before 19 Nov 2025 00:00 | 21 Nov 2025 04:45 | at least 2 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.