Archived data: PSE has not reported this unit since 31 Dec 2025
Hard coal unit

KAR_1-02

plant: Karolin 2 · operator: Veolia Energia Poznań

Operating history

The selected period applies to the operating strip and daily energy: 2 Dec – 31 Dec 2025
All

Operation and stops

In operation on 16 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Wednesday 31 Dec 2025 · 0 MWh

Day profile

Wednesday 31 Dec 2025, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
62.5%
Outages in total
16 days
StartEndLengthLabel
27 Dec 2025 00:15at least until 1 Jan 2026 00:00at least 4 days
8 Dec 2025 02:0017 Dec 2025 01:008 days
before 19 Nov 2025 00:0021 Nov 2025 04:45at least 2 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.