Archived data: PSE has not reported this unit since 18 Feb 2026
Hard coal unit

KAT 1-01

plant: Katowice · operator: Tauron Ciepło

Operating history

The selected period applies to the operating strip and daily energy: 20 Jan – 18 Feb 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Wednesday 18 Feb 2026 · 2,400 MWh

Day profile

Wednesday 18 Feb 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
100.0%
Outages in total
0 days
No outages lasting at least a day in the data from the last 12 months.
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.