The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KOZ11S06

plant: Kozienice 1 · operator: Enea Wytwarzanie
Power now
130 MW
Load
62% of 220 MW
Running without a break
31 days, since 17 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 220 MW
now 130 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,100 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
78.0%
Outages in total
76 days
StartEndLengthLabel
14 Oct 2026 00:0017 Oct 2026 14:153 days
26 Sep 2026 00:306 Oct 2026 00:009 dayslonger outage
5 Sep 2026 13:1510 Sep 2026 21:155 days
12 Aug 2026 16:1513 Aug 2026 17:001 day
12 Jul 2026 18:3014 Jul 2026 23:002 days
4 Jun 2026 00:0026 Jun 2026 18:0022 dayslong outage
24 May 2026 07:001 Jun 2026 14:308 dayslonger outage
24 Apr 2026 19:0027 Apr 2026 03:302 days
28 Feb 2026 00:301 Mar 2026 23:451 day
31 Dec 2025 23:152 Jan 2026 04:001 day
6 Dec 2025 07:0022 Dec 2025 00:3015 dayslong outage
3 Dec 2025 12:155 Dec 2025 04:301 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.