PLEN
Hard coal unit

LGA_4S10

plant: Łagisza · operator: Tauron Wytwarzanie
Power now
0 MW
Load
0% of 430 MW
Not running
50 days, since 29 Sep 2026
very long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 430 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
67.2%
Outages in total
92 days
StartEndLengthLabel
29 Sep 2026 09:30ongoing 50 daysvery long outage
14 Sep 2026 00:1520 Sep 2026 17:156 days
8 Jul 2026 00:0010 Jul 2026 02:302 days
4 Apr 2026 09:3028 Apr 2026 12:3024 dayslong outage
14 Feb 2026 00:0023 Feb 2026 08:009 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.