The Watt Mix
live · 10:45 CET
PLEN
Hard coal power plant

Łagisza

Będzin (Silesian Voivodeship) · operator: Tauron Wytwarzanie
Power now
0 MW
Units running
0 of 1
Share of Poland's generation now
0.0%

1 unit not running

Shortest stop first. A label appears from 7 days.
LGA_4S10since 29 Sep 202650 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Archived units

Units PSE no longer reports, for example under a former code.
LGA 4-10last data 31 Jan 2026

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

About the plant

Unit 10, with a capacity of 460 MW, from 2009: the world's first supercritical unit with a fluidised-bed boiler on this scale.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.