Biomass power plant
Połaniec 2-Pasywna
Zawada near Połaniec (Świętokrzyskie Voivodeship) · operator: Enea Elektrownia Połaniec
Power now
180 MW
Units running
1 of 1
Share of Poland's generation now
0.8%
1 unit running
Output at 10:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
Archived units
Units PSE no longer reports, for example under a former code.
POL24-09last data 31 Dec 2024
Operating history
The selected period applies to both charts below: 20 Oct – 18 Nov 2026
Which units ran and when
One cell is one day. Days in operation during the period are on the right.
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | POL24S09 |
|---|---|
| 18 Nov 2026 | 86% |
| 17 Nov 2026 | 85% |
| 16 Nov 2026 | 85% |
| 15 Nov 2026 | 82% |
| 14 Nov 2026 | 79% |
| 13 Nov 2026 | 77% |
| 12 Nov 2026 | 86% |
| 11 Nov 2026 | 88% |
| 10 Nov 2026 | 93% |
| 9 Nov 2026 | 91% |
| 8 Nov 2026 | 87% |
| 7 Nov 2026 | 91% |
| 6 Nov 2026 | 90% |
| 5 Nov 2026 | 90% |
| 4 Nov 2026 | 91% |
| 3 Nov 2026 | 91% |
| 2 Nov 2026 | 91% |
| 1 Nov 2026 | 86% |
| 31 Oct 2026 | 82% |
| 30 Oct 2026 | 79% |
| 29 Oct 2026 | 76% |
| 28 Oct 2026 | 80% |
| 27 Oct 2026 | 81% |
| 26 Oct 2026 | 83% |
| 25 Oct 2026 | 77% |
| 24 Oct 2026 | 89% |
| 23 Oct 2026 | 92% |
| 22 Oct 2026 | 88% |
| 21 Oct 2026 | 83% |
| 20 Oct 2026 | 73% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,300 MWh
Day profile
Tuesday 17 Nov 2026, MW
About the plant
The Green Unit (Zielony Blok): around 225 MW gross, commissioned in 2012, one of the world's largest units fired exclusively with biomass.
The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.