The Watt Mix
live · 10:45 CET
PLEN
Biomass unit

POL24S09

plant: Połaniec 2-Pasywna · operator: Enea Elektrownia Połaniec
Power now
180 MW
Load
87% of 210 MW
Running without a break
19 days, since 29 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 210 MW
now 180 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,300 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
81.8%
Outages in total
63 days
StartEndLengthLabel
11 Jul 2026 05:0019 Jul 2026 11:158 dayslonger outage
16 May 2026 03:1519 May 2026 13:453 days
27 Feb 2026 23:158 Apr 2026 10:4539 daysvery long outage
26 Dec 2025 22:4530 Dec 2025 19:453 days
12 Dec 2025 22:4521 Dec 2025 01:008 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.