plant: Karolin 2 · operator: Veolia Energia Poznań

Operating history

The selected period applies to the operating strip and daily energy: 2 Dec – 31 Dec 2025
All

Operation and stops

In operation on 22 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Wednesday 31 Dec 2025 · 1,300 MWh

Day profile

Wednesday 31 Dec 2025, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
78.1%
Outages in total
9 days
StartEndLengthLabel
17 Dec 2025 16:0023 Dec 2025 05:305 days
4 Dec 2025 10:157 Dec 2025 21:453 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.