The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KOZ24S10

plant: Kozienice 2 · operator: Enea Wytwarzanie
Power now
0 MW
Load
0% of 540 MW
Not running
62 days, since 17 Sep 2026
very long outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 540 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 0 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
57.2%
Outages in total
153 days
StartEndLengthLabel
17 Sep 2026 00:15ongoing 62 daysvery long outage
7 Aug 2026 22:1512 Aug 2026 14:454 days
17 Jul 2026 23:0025 Jul 2026 15:307 dayslonger outage
27 Jun 2026 07:1528 Jun 2026 16:301 day
8 Jun 2026 20:1518 Jun 2026 16:159 dayslonger outage
18 Apr 2026 00:1511 May 2026 01:0023 dayslong outage
11 Apr 2026 09:4513 Apr 2026 00:451 day
13 Mar 2026 00:0015 Mar 2026 23:152 days
28 Feb 2026 08:009 Mar 2026 15:159 dayslonger outage
20 Feb 2026 23:4526 Feb 2026 02:455 days
16 Jan 2026 21:4519 Jan 2026 03:452 days
10 Jan 2026 01:0012 Jan 2026 04:002 days
25 Dec 2025 01:007 Jan 2026 04:1513 dayslonger outage
29 Nov 2025 00:001 Dec 2025 01:452 days
before 19 Nov 2025 00:0024 Nov 2025 05:30at least 5 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.