Power now
0 MW
Load
0% of 540 MW
Not running
62 days, since 17 Sep 2026
very long outage
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 540 MW
now 0 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 0 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | KOZ24S10 |
|---|---|
| 18 Nov 2026 | stopped |
| 17 Nov 2026 | stopped |
| 16 Nov 2026 | stopped |
| 15 Nov 2026 | stopped |
| 14 Nov 2026 | stopped |
| 13 Nov 2026 | stopped |
| 12 Nov 2026 | stopped |
| 11 Nov 2026 | stopped |
| 10 Nov 2026 | stopped |
| 9 Nov 2026 | stopped |
| 8 Nov 2026 | stopped |
| 7 Nov 2026 | stopped |
| 6 Nov 2026 | stopped |
| 5 Nov 2026 | stopped |
| 4 Nov 2026 | stopped |
| 3 Nov 2026 | stopped |
| 2 Nov 2026 | stopped |
| 1 Nov 2026 | stopped |
| 31 Oct 2026 | stopped |
| 30 Oct 2026 | stopped |
| 29 Oct 2026 | stopped |
| 28 Oct 2026 | stopped |
| 27 Oct 2026 | stopped |
| 26 Oct 2026 | stopped |
| 25 Oct 2026 | stopped |
| 24 Oct 2026 | stopped |
| 23 Oct 2026 | stopped |
| 22 Oct 2026 | stopped |
| 21 Oct 2026 | stopped |
| 20 Oct 2026 | stopped |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
57.2%
Outages in total
153 days
| Start | End | Length | Label |
|---|---|---|---|
| 17 Sep 2026 00:15 | ongoing | 62 days | very long outage |
| 7 Aug 2026 22:15 | 12 Aug 2026 14:45 | 4 days | |
| 17 Jul 2026 23:00 | 25 Jul 2026 15:30 | 7 days | longer outage |
| 27 Jun 2026 07:15 | 28 Jun 2026 16:30 | 1 day | |
| 8 Jun 2026 20:15 | 18 Jun 2026 16:15 | 9 days | longer outage |
| 18 Apr 2026 00:15 | 11 May 2026 01:00 | 23 days | long outage |
| 11 Apr 2026 09:45 | 13 Apr 2026 00:45 | 1 day | |
| 13 Mar 2026 00:00 | 15 Mar 2026 23:15 | 2 days | |
| 28 Feb 2026 08:00 | 9 Mar 2026 15:15 | 9 days | longer outage |
| 20 Feb 2026 23:45 | 26 Feb 2026 02:45 | 5 days | |
| 16 Jan 2026 21:45 | 19 Jan 2026 03:45 | 2 days | |
| 10 Jan 2026 01:00 | 12 Jan 2026 04:00 | 2 days | |
| 25 Dec 2025 01:00 | 7 Jan 2026 04:15 | 13 days | longer outage |
| 29 Nov 2025 00:00 | 1 Dec 2025 01:45 | 2 days | |
| before 19 Nov 2025 00:00 | 24 Nov 2025 05:30 | at least 5 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.