Hard coal power plant

Kozienice 2

Świerże Górne near Kozienice (Masovian Voivodeship) · operator: Enea Wytwarzanie
Power now
1,250 MW
Units running
2 of 3
Share of Poland's generation now
5.7%

2 units running

Output at 09:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
KOZ24S09
300 MW
55% of 550 MW
KOZ24S11
950 MW
97% of 980 MW

1 unit not running

Shortest stop first. A label appears from 7 days.
KOZ24S10since 17 Sep 202662 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Archived units

Units PSE no longer reports, for example under a former code.
KOZ24-09last data 30 Apr 2025
KOZ24-10last data 30 Apr 2025
KOZ24-11last data 30 Apr 2025

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 30,700 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

Units 9 and 10 (around 566 MW each) and the supercritical unit 11 with a capacity of 1075 MW, the largest coal-fired unit in Poland.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.