The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KOZ24S11

plant: Kozienice 2 · operator: Enea Wytwarzanie
Power now
940 MW
Load
95% of 980 MW
Running without a break
9 days, since 8 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 980 MW
now 940 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 19 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 19,800 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
63.4%
Outages in total
133 days
StartEndLengthLabel
22 Oct 2026 17:003 Nov 2026 21:0012 dayslonger outage
4 Jul 2026 00:1513 Sep 2026 18:4571 daysvery long outage
9 Jun 2026 13:1513 Jun 2026 00:153 days
21 May 2026 08:453 Jun 2026 04:0012 dayslonger outage
4 Apr 2026 03:157 Apr 2026 14:003 days
25 Feb 2026 21:153 Mar 2026 22:006 days
7 Feb 2026 15:1518 Feb 2026 09:3010 dayslonger outage
25 Jan 2026 20:301 Feb 2026 15:006 days
30 Nov 2025 22:456 Dec 2025 12:005 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.