The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KLE 1-02

plant: Kraków Łęg · operator: PGE Energia Ciepła
Power now
0 MW
Load
0% of 120 MW
Not running
7 days, since 11 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 120 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 20 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
39.0%
Outages in total
222 days
StartEndLengthLabel
11 Nov 2026 01:00ongoing 7 days
23 Oct 2026 22:0026 Oct 2026 00:302 days
17 Oct 2026 00:0018 Oct 2026 20:301 day
5 Oct 2026 03:1514 Oct 2026 20:309 days
23 Aug 2026 00:452 Oct 2026 16:0040 dayslong outage
6 Aug 2026 22:0018 Aug 2026 06:1511 days
4 Aug 2026 19:156 Aug 2026 13:001 day
30 Jun 2026 22:004 Aug 2026 15:0034 dayslong outage
29 Jun 2026 03:4530 Jun 2026 12:451 day
19 May 2026 09:0016 Jun 2026 18:1528 dayslonger outage
11 Mar 2026 08:0015 May 2026 16:1565 daysvery long outage
20 Dec 2025 22:1529 Dec 2025 17:008 days
8 Dec 2025 00:0012 Dec 2025 07:154 days
before 19 Nov 2025 00:0023 Nov 2025 13:00at least 4 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.