Hard coal unit

KLE 1-03

plant: Kraków Łęg · operator: PGE Energia Ciepła
Power now
0 MW
Load
0% of 100 MW
Not running
14 days, since 4 Nov 2026
longer outage

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 100 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 7 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
54.8%
Outages in total
162 days
StartEndLengthLabel
4 Nov 2026 03:15ongoing 14 dayslonger outage
3 Oct 2026 05:4529 Oct 2026 04:0025 dayslonger outage
24 Aug 2026 05:1513 Sep 2026 16:0020 dayslonger outage
14 Jun 2026 07:0023 Aug 2026 17:4570 daysvery long outage
25 Apr 2026 23:153 May 2026 19:007 days
21 Feb 2026 12:1513 Mar 2026 17:3020 dayslonger outage
30 Nov 2025 01:002 Dec 2025 23:152 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.