The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

KLE 1-04

plant: Kraków Łęg · operator: PGE Energia Ciepła
Power now
80 MW
Load
69% of 110 MW
Running without a break
14 days, since 4 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 110 MW
now 80 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 25 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,800 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
45.4%
Outages in total
199 days
StartEndLengthLabel
30 Oct 2026 00:004 Nov 2026 07:005 days
8 Oct 2026 00:0011 Oct 2026 16:453 days
23 Sep 2026 22:003 Oct 2026 11:009 days
13 Sep 2026 09:0023 Sep 2026 05:159 days
3 May 2026 09:0031 Aug 2026 16:00120 daysvery long outage
14 Apr 2026 09:0025 Apr 2026 21:0011 days
13 Mar 2026 08:008 Apr 2026 17:1526 dayslonger outage
10 Feb 2026 00:0015 Feb 2026 03:455 days
4 Feb 2026 05:308 Feb 2026 11:454 days
18 Dec 2025 00:1520 Dec 2025 20:002 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.