Power now
80 MW
Load
69% of 110 MW
Running without a break
14 days, since 4 Nov 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 110 MW
now 80 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 25 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | KLE 1-04 |
|---|---|
| 18 Nov 2026 | 66% |
| 17 Nov 2026 | 69% |
| 16 Nov 2026 | 85% |
| 15 Nov 2026 | 87% |
| 14 Nov 2026 | 85% |
| 13 Nov 2026 | 89% |
| 12 Nov 2026 | 83% |
| 11 Nov 2026 | 89% |
| 10 Nov 2026 | 88% |
| 9 Nov 2026 | 88% |
| 8 Nov 2026 | 89% |
| 7 Nov 2026 | 90% |
| 6 Nov 2026 | 87% |
| 5 Nov 2026 | 83% |
| 4 Nov 2026 | 59% |
| 3 Nov 2026 | stopped |
| 2 Nov 2026 | stopped |
| 1 Nov 2026 | stopped |
| 31 Oct 2026 | stopped |
| 30 Oct 2026 | stopped |
| 29 Oct 2026 | 70% |
| 28 Oct 2026 | 81% |
| 27 Oct 2026 | 71% |
| 26 Oct 2026 | 63% |
| 25 Oct 2026 | 59% |
| 24 Oct 2026 | 70% |
| 23 Oct 2026 | 70% |
| 22 Oct 2026 | 75% |
| 21 Oct 2026 | 66% |
| 20 Oct 2026 | 72% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 1,800 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
45.4%
Outages in total
199 days
| Start | End | Length | Label |
|---|---|---|---|
| 30 Oct 2026 00:00 | 4 Nov 2026 07:00 | 5 days | |
| 8 Oct 2026 00:00 | 11 Oct 2026 16:45 | 3 days | |
| 23 Sep 2026 22:00 | 3 Oct 2026 11:00 | 9 days | |
| 13 Sep 2026 09:00 | 23 Sep 2026 05:15 | 9 days | |
| 3 May 2026 09:00 | 31 Aug 2026 16:00 | 120 days | very long outage |
| 14 Apr 2026 09:00 | 25 Apr 2026 21:00 | 11 days | |
| 13 Mar 2026 08:00 | 8 Apr 2026 17:15 | 26 days | longer outage |
| 10 Feb 2026 00:00 | 15 Feb 2026 03:45 | 5 days | |
| 4 Feb 2026 05:30 | 8 Feb 2026 11:45 | 4 days | |
| 18 Dec 2025 00:15 | 20 Dec 2025 20:00 | 2 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.