The Watt Mix
PLEN
Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

LGA 4-10

plant: Łagisza · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 30 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 6,300 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
96.9%
Outages in total
2 days
StartEndLengthLabel
22 Nov 2025 00:0024 Nov 2025 04:152 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.