Hard coal unit

LZA32-11

plant: Łaziska 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 27 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 3,100 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
74.3%
Outages in total
18 days
StartEndLengthLabel
10 Jan 2026 00:0012 Jan 2026 02:452 days
2 Jan 2026 12:004 Jan 2026 14:002 days
22 Dec 2025 21:1531 Dec 2025 18:008 dayslonger outage
29 Nov 2025 01:001 Dec 2025 02:152 days
21 Nov 2025 21:1523 Nov 2025 15:001 day
before 19 Nov 2025 00:0020 Nov 2025 10:45at least 1 day
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.