The Watt Mix
PLEN
Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

LZA32-12

plant: Łaziska 3 · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 21 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 0 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
54.1%
Outages in total
33 days
StartEndLengthLabel
30 Jan 2026 21:15at least until 1 Feb 2026 00:00at least 1 day
25 Jan 2026 00:0026 Jan 2026 04:151 day
18 Jan 2026 00:0019 Jan 2026 00:001 day
7 Jan 2026 20:309 Jan 2026 02:301 day
23 Dec 2025 22:007 Jan 2026 04:0014 dayslong outage
12 Dec 2025 22:1519 Dec 2025 04:456 days
10 Dec 2025 00:0011 Dec 2025 13:001 day
1 Dec 2025 10:008 Dec 2025 04:456 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.