Hard coal power plant

Ostrołęka B

Ostrołęka (Masovian Voivodeship) · operator: Energa (Grupa Orlen)
Power now
140 MW
Units running
1 of 3
Share of Poland's generation now
0.6%

1 unit running

Output at 10:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
OSB_2S01
140 MW
64% of 220 MW

2 units not running

Shortest stop first. A label appears from 7 days.
OSB_1S03since 12 Nov 20265 days
OSB_2S02since 11 Nov 20267 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Archived units

Units PSE no longer reports, for example under a former code.
OSB 1-03last data 30 Apr 2025
OSB 2-01last data 30 Apr 2025
OSB 2-02last data 30 Apr 2025

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,600 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

Three coal-fired units (around 230, 230 and 165 MW). Not to be confused with the Ostrołęka C gas-fired unit under construction next to it.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.