Power now
140 MW
Load
64% of 220 MW
Running without a break
9 days, since 9 Nov 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 220 MW
now 140 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 18 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | OSB_2S01 |
|---|---|
| 18 Nov 2026 | 71% |
| 17 Nov 2026 | 86% |
| 16 Nov 2026 | 79% |
| 15 Nov 2026 | 63% |
| 14 Nov 2026 | 72% |
| 13 Nov 2026 | 82% |
| 12 Nov 2026 | 90% |
| 11 Nov 2026 | 97% |
| 10 Nov 2026 | 96% |
| 9 Nov 2026 | 70% |
| 8 Nov 2026 | stopped |
| 7 Nov 2026 | stopped |
| 6 Nov 2026 | stopped |
| 5 Nov 2026 | stopped |
| 4 Nov 2026 | stopped |
| 3 Nov 2026 | stopped |
| 2 Nov 2026 | stopped |
| 1 Nov 2026 | stopped |
| 31 Oct 2026 | 71% |
| 30 Oct 2026 | 90% |
| 29 Oct 2026 | 96% |
| 28 Oct 2026 | 48% |
| 27 Oct 2026 | stopped |
| 26 Oct 2026 | stopped |
| 25 Oct 2026 | stopped |
| 24 Oct 2026 | stopped |
| 23 Oct 2026 | 75% |
| 22 Oct 2026 | 80% |
| 21 Oct 2026 | 84% |
| 20 Oct 2026 | 84% |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,600 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
41.7%
Outages in total
208 days
| Start | End | Length | Label |
|---|---|---|---|
| 31 Oct 2026 19:45 | 9 Nov 2026 04:15 | 8 days | longer outage |
| 24 Oct 2026 00:15 | 28 Oct 2026 09:45 | 4 days | |
| 16 Oct 2026 10:00 | 19 Oct 2026 03:15 | 2 days | |
| 29 Sep 2026 00:00 | 1 Oct 2026 03:15 | 2 days | |
| 16 Sep 2026 00:15 | 23 Sep 2026 03:45 | 7 days | longer outage |
| 23 Aug 2026 20:00 | 25 Aug 2026 03:30 | 1 day | |
| 22 Aug 2026 08:45 | 23 Aug 2026 19:15 | 1 day | |
| 8 Aug 2026 00:00 | 11 Aug 2026 03:30 | 3 days | |
| 1 Aug 2026 18:00 | 3 Aug 2026 04:45 | 1 day | |
| 30 Mar 2026 00:00 | 1 Aug 2026 16:45 | 124 days | very long outage |
| 23 Mar 2026 18:45 | 27 Mar 2026 15:45 | 3 days | |
| 18 Mar 2026 19:15 | 23 Mar 2026 16:45 | 4 days | |
| 5 Mar 2026 20:15 | 12 Mar 2026 13:00 | 6 days | |
| 2 Mar 2026 18:45 | 5 Mar 2026 13:00 | 2 days | |
| 20 Feb 2026 12:00 | 25 Feb 2026 14:30 | 5 days | |
| 17 Feb 2026 21:15 | 19 Feb 2026 03:15 | 1 day | |
| 6 Feb 2026 19:30 | 16 Feb 2026 04:30 | 9 days | longer outage |
| 29 Dec 2025 09:45 | 30 Dec 2025 15:15 | 1 day | |
| 18 Dec 2025 18:30 | 22 Dec 2025 04:00 | 3 days | |
| 2 Dec 2025 08:15 | 8 Dec 2025 03:45 | 5 days | |
| 28 Nov 2025 20:30 | 1 Dec 2025 03:15 | 2 days | |
| 19 Nov 2025 15:45 | 24 Nov 2025 03:30 | 4 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.