The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

OSB_2S01

plant: Ostrołęka B · operator: Energa (Grupa Orlen)
Power now
140 MW
Load
64% of 220 MW
Running without a break
9 days, since 9 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 220 MW
now 140 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 18 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 4,600 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
41.7%
Outages in total
208 days
StartEndLengthLabel
31 Oct 2026 19:459 Nov 2026 04:158 dayslonger outage
24 Oct 2026 00:1528 Oct 2026 09:454 days
16 Oct 2026 10:0019 Oct 2026 03:152 days
29 Sep 2026 00:001 Oct 2026 03:152 days
16 Sep 2026 00:1523 Sep 2026 03:457 dayslonger outage
23 Aug 2026 20:0025 Aug 2026 03:301 day
22 Aug 2026 08:4523 Aug 2026 19:151 day
8 Aug 2026 00:0011 Aug 2026 03:303 days
1 Aug 2026 18:003 Aug 2026 04:451 day
30 Mar 2026 00:001 Aug 2026 16:45124 daysvery long outage
23 Mar 2026 18:4527 Mar 2026 15:453 days
18 Mar 2026 19:1523 Mar 2026 16:454 days
5 Mar 2026 20:1512 Mar 2026 13:006 days
2 Mar 2026 18:455 Mar 2026 13:002 days
20 Feb 2026 12:0025 Feb 2026 14:305 days
17 Feb 2026 21:1519 Feb 2026 03:151 day
6 Feb 2026 19:3016 Feb 2026 04:309 dayslonger outage
29 Dec 2025 09:4530 Dec 2025 15:151 day
18 Dec 2025 18:3022 Dec 2025 04:003 days
2 Dec 2025 08:158 Dec 2025 03:455 days
28 Nov 2025 20:301 Dec 2025 03:152 days
19 Nov 2025 15:4524 Nov 2025 03:304 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.