The Watt Mix
live · 10:45 CET
PLEN
Hard coal power plant

Połaniec

Zawada near Połaniec (Świętokrzyskie Voivodeship) · operator: Enea Elektrownia Połaniec
Power now
300 MW
Units running
2 of 6
Share of Poland's generation now
1.3%

2 units running

Output at 10:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
POL_2S03
140 MW
62% of 230 MW
POL_4S06
150 MW
68% of 230 MW

4 units not running

Shortest stop first. A label appears from 7 days.
POL_4S05since yesterday 21:4513 h
POL_4S07since 14 Nov 20264 days
POL_2S04since 13 Nov 20265 days
POL_2S02since 11 Nov 20267 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one. Combined heat and power plants and pumped-storage plants have their own thresholds.

Archived units

Units PSE no longer reports, for example under a former code.
POL 2-03last data 31 Dec 2024
POL 2-04last data 31 Dec 2024
POL 4-05last data 31 Dec 2024
POL 4-06last data 31 Dec 2024
POL 4-07last data 31 Dec 2024
POL_2-02last data 31 Dec 2024

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 9,600 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

Coal-fired units of the 225–240 MW class, in operation since the late 1970s.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.