Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

SIA 1-01

plant: Siersza · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 11 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 0 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
15.2%
Outages in total
62 days
StartEndLengthLabel
30 Jan 2026 22:00at least until 1 Feb 2026 00:00at least 1 day
19 Jan 2026 08:0029 Jan 2026 00:009 dayslonger outage
9 Jan 2026 19:3012 Jan 2026 05:302 days
29 Dec 2025 08:459 Jan 2026 07:1510 dayslonger outage
before 19 Nov 2025 00:0026 Dec 2025 13:45at least 37 daysvery long outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.