Archived data: PSE has not reported this unit since 31 Jan 2026
Hard coal unit

SIA 1-02

plant: Siersza · operator: Tauron Wytwarzanie

Operating history

The selected period applies to the operating strip and daily energy: 2 Jan – 31 Jan 2026
All

Operation and stops

In operation on 23 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Saturday 31 Jan 2026 · 0 MWh

Day profile

Saturday 31 Jan 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
32.4%
Outages in total
50 days
StartEndLengthLabel
29 Jan 2026 20:15at least until 1 Feb 2026 00:00at least 2 days
18 Jan 2026 00:0019 Jan 2026 00:001 day
11 Jan 2026 00:0012 Jan 2026 00:151 day
30 Nov 2025 17:005 Jan 2026 05:0035 daysvery long outage
before 19 Nov 2025 00:0029 Nov 2025 07:45at least 10 dayslonger outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.