plant: Skawina · operator: ResInvest Energy Skawina
Power now
60 MW
Load
65% of 100 MW
Running without a break
14 days, since 4 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 100 MW
now 60 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 18 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,200 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
36.0%
Outages in total
233 days
StartEndLengthLabel
31 Oct 2026 00:004 Nov 2026 01:154 days
22 Oct 2026 22:1529 Oct 2026 00:456 days
23 Sep 2026 16:3022 Oct 2026 03:4528 dayslonger outage
1 Jul 2026 09:4510 Jul 2026 16:009 days
8 Apr 2026 10:0030 Jun 2026 17:4583 daysvery long outage
21 Feb 2026 01:0030 Mar 2026 20:3037 dayslong outage
15 Jan 2026 10:005 Feb 2026 07:1520 dayslonger outage
7 Jan 2026 09:0015 Jan 2026 05:307 days
2 Dec 2025 17:007 Jan 2026 07:0035 dayslong outage
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.