Hard coal unit

SNA22S06

plant: Skawina · operator: ResInvest Energy Skawina
Power now
0 MW
Load
0% of 100 MW
Not running
12 days, since 5 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 100 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 17 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
49.3%
Outages in total
184 days
StartEndLengthLabel
5 Nov 2026 21:00ongoing 12 days
10 Jul 2026 22:0028 Sep 2026 05:1579 daysvery long outage
20 May 2026 11:4519 Jun 2026 02:0029 dayslonger outage
31 Mar 2026 01:458 Apr 2026 05:158 days
11 Jan 2026 00:4520 Feb 2026 23:1540 dayslong outage
before 19 Nov 2025 00:002 Dec 2025 13:30at least 13 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.