The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

WROB1-02

plant: Wrocław · operator: PGE Energia Ciepła
Power now
0 MW
Load
0% of 100 MW
Not running
4 days, since 14 Nov 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 100 MW
now 0 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 1 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
43.2%
Outages in total
207 days
StartEndLengthLabel
14 Nov 2026 02:15ongoing 4 days
1 Aug 2026 18:3013 Nov 2026 15:00103 daysvery long outage
8 Jul 2026 08:3020 Jul 2026 03:1511 days
24 Apr 2026 13:4524 Jun 2026 01:1560 daysvery long outage
20 Mar 2026 02:0023 Mar 2026 00:002 days
15 Mar 2026 08:4519 Mar 2026 22:304 days
7 Mar 2026 10:009 Mar 2026 14:452 days
27 Feb 2026 14:003 Mar 2026 02:303 days
24 Dec 2025 01:151 Jan 2026 00:007 days
before 19 Nov 2025 00:0024 Nov 2025 00:45at least 5 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.