Power now
0 MW
Load
0% of 100 MW
Not running
4 days, since 14 Nov 2026
Last 24 hours
Unit output, MW, every 15 minutes
maximum power 100 MW
now 0 MW
Operating history
The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
Operation and stops
In operation on 1 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | WROB1-02 |
|---|---|
| 18 Nov 2026 | stopped |
| 17 Nov 2026 | stopped |
| 16 Nov 2026 | stopped |
| 15 Nov 2026 | stopped |
| 14 Nov 2026 | stopped |
| 13 Nov 2026 | 14% |
| 12 Nov 2026 | stopped |
| 11 Nov 2026 | stopped |
| 10 Nov 2026 | stopped |
| 9 Nov 2026 | stopped |
| 8 Nov 2026 | stopped |
| 7 Nov 2026 | stopped |
| 6 Nov 2026 | stopped |
| 5 Nov 2026 | stopped |
| 4 Nov 2026 | stopped |
| 3 Nov 2026 | stopped |
| 2 Nov 2026 | stopped |
| 1 Nov 2026 | stopped |
| 31 Oct 2026 | stopped |
| 30 Oct 2026 | stopped |
| 29 Oct 2026 | stopped |
| 28 Oct 2026 | stopped |
| 27 Oct 2026 | stopped |
| 26 Oct 2026 | stopped |
| 25 Oct 2026 | stopped |
| 24 Oct 2026 | stopped |
| 23 Oct 2026 | stopped |
| 22 Oct 2026 | stopped |
| 21 Oct 2026 | stopped |
| 20 Oct 2026 | stopped |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 0 MWh
Day profile
Tuesday 17 Nov 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
43.2%
Outages in total
207 days
| Start | End | Length | Label |
|---|---|---|---|
| 14 Nov 2026 02:15 | ongoing | 4 days | |
| 1 Aug 2026 18:30 | 13 Nov 2026 15:00 | 103 days | very long outage |
| 8 Jul 2026 08:30 | 20 Jul 2026 03:15 | 11 days | |
| 24 Apr 2026 13:45 | 24 Jun 2026 01:15 | 60 days | very long outage |
| 20 Mar 2026 02:00 | 23 Mar 2026 00:00 | 2 days | |
| 15 Mar 2026 08:45 | 19 Mar 2026 22:30 | 4 days | |
| 7 Mar 2026 10:00 | 9 Mar 2026 14:45 | 2 days | |
| 27 Feb 2026 14:00 | 3 Mar 2026 02:30 | 3 days | |
| 24 Dec 2025 01:15 | 1 Jan 2026 00:00 | 7 days | |
| before 19 Nov 2025 00:00 | 24 Nov 2025 00:45 | at least 5 days |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.