The Watt Mix
live · 10:45 CET
PLEN
Hard coal unit

WROB1-03

plant: Wrocław · operator: PGE Energia Ciepła
Power now
60 MW
Load
66% of 90 MW
Running without a break
19 days, since 30 Oct 2026

Last 24 hours

Unit output, MW, every 15 minutes
maximum power 90 MW
now 60 MW

Operating history

The selected period applies to the operating strip and daily energy: 20 Oct – 18 Nov 2026
All

Operation and stops

In operation on 24 of 30 days
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,000 MWh

Day profile

Tuesday 17 Nov 2026, MW

Outages in the last 12 months

Lasting at least a day, most recent first
Time in operation
75.8%
Outages in total
88 days
StartEndLengthLabel
24 Oct 2026 01:0030 Oct 2026 10:156 days
19 Sep 2026 01:1523 Sep 2026 05:304 days
19 Jul 2026 11:005 Aug 2026 18:1517 dayslonger outage
24 Jun 2026 05:458 Jul 2026 06:0014 dayslonger outage
12 Apr 2026 09:0021 Apr 2026 02:008 days
9 Mar 2026 09:3015 Mar 2026 02:005 days
22 Feb 2026 00:157 Mar 2026 07:3013 days
14 Dec 2025 08:0022 Dec 2025 03:157 days
8 Dec 2025 06:4514 Dec 2025 00:155 days
2 Dec 2025 09:007 Dec 2025 03:454 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.