Coal-fired CHP plant

Wrocław

Wrocław · operator: PGE Energia Ciepła
Power now
60 MW
Units running
1 of 2
Share of Poland's generation now
0.3%

1 unit running

Output at 10:45. Bar length shows each unit's output on one shared scale; the grey background is its maximum power.
WROB1-03
60 MW
66% of 90 MW

1 unit not running

Shortest stop first. A label appears from 14 days.
WROB1-02since 14 Nov 20264 days
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 14–29 days is a longer outage, 30–59 days a long one, 60 days or more a very long one. These are the thresholds for combined heat and power plants, which stop seasonally.

Operating history

The selected period applies to both charts below: 20 Oct – 18 Nov 2026
All

Which units ran and when

One cell is one day. Days in operation during the period are on the right.
stoppedrunning below 60% of max powerrunning at 60% or more

Daily energy

Whole plant, MWh per day. Select a day to see its profile.
selected day: Tuesday 17 Nov 2026 · 2,000 MWh

Day profile

Tuesday 17 Nov 2026, MW; layers are units

About the plant

The Wrocław combined heat and power (CHP) plant, the city's main heat source; fired with hard coal.

The description, operator and location are entered by hand and approximate. A unit leaves the list when PSE stops reporting it and moves to archived units with the date of its last data.