Archived data: PSE has not reported this unit since 31 Aug 2026
The units have been taken out of service.
Operating history
The selected period applies to the operating strip and daily energy: 2 Aug – 31 Aug 2026
Operation and stops
In operation on 6 of 30 days
The value is the unit's average load over the day as a percentage of its maximum power; below 60% means running at reduced power.
| Day | DOD_2-06 |
|---|---|
| 31 Aug 2026 | stopped |
| 30 Aug 2026 | stopped |
| 29 Aug 2026 | stopped |
| 28 Aug 2026 | stopped |
| 27 Aug 2026 | stopped |
| 26 Aug 2026 | stopped |
| 25 Aug 2026 | stopped |
| 24 Aug 2026 | stopped |
| 23 Aug 2026 | stopped |
| 22 Aug 2026 | stopped |
| 21 Aug 2026 | stopped |
| 20 Aug 2026 | stopped |
| 19 Aug 2026 | stopped |
| 18 Aug 2026 | stopped |
| 17 Aug 2026 | stopped |
| 16 Aug 2026 | stopped |
| 15 Aug 2026 | 19% |
| 14 Aug 2026 | 28% |
| 13 Aug 2026 | 28% |
| 12 Aug 2026 | 45% |
| 11 Aug 2026 | 57% |
| 10 Aug 2026 | 24% |
| 9 Aug 2026 | stopped |
| 8 Aug 2026 | stopped |
| 7 Aug 2026 | stopped |
| 6 Aug 2026 | stopped |
| 5 Aug 2026 | stopped |
| 4 Aug 2026 | stopped |
| 3 Aug 2026 | stopped |
| 2 Aug 2026 | stopped |
stoppedrunning below 60% of max powerrunning at 60% or more
Daily energy
MWh per day. Select a day to see its profile.
selected day: Monday 31 Aug 2026 · 0 MWh
Day profile
Monday 31 Aug 2026, MW
Outages in the last 12 months
Lasting at least a day, most recent first
Time in operation
35.9%
Outages in total
176 days
| Start | End | Length | Label |
|---|---|---|---|
| 15 Aug 2026 09:00 | at least until 1 Sep 2026 00:00 | at least 16 days | long outage |
| 28 Jul 2026 00:00 | 10 Aug 2026 14:00 | 13 days | longer outage |
| 24 Jul 2026 11:00 | 26 Jul 2026 17:00 | 2 days | |
| 21 Jul 2026 10:00 | 22 Jul 2026 22:45 | 1 day | |
| 16 Jul 2026 17:15 | 21 Jul 2026 02:15 | 4 days | |
| 28 Jun 2026 01:00 | 16 Jul 2026 05:45 | 18 days | long outage |
| 25 Jun 2026 01:15 | 26 Jun 2026 16:00 | 1 day | |
| 19 Jun 2026 00:45 | 22 Jun 2026 07:00 | 3 days | |
| 14 Jun 2026 22:45 | 18 Jun 2026 15:30 | 3 days | |
| 11 Jun 2026 22:30 | 14 Jun 2026 16:00 | 2 days | |
| 9 Jun 2026 01:45 | 11 Jun 2026 14:45 | 2 days | |
| 4 Jun 2026 00:15 | 8 Jun 2026 18:00 | 4 days | |
| 19 May 2026 09:15 | 3 Jun 2026 17:00 | 15 days | long outage |
| 15 May 2026 08:30 | 18 May 2026 14:45 | 3 days | |
| 27 Apr 2026 11:15 | 12 May 2026 23:00 | 15 days | long outage |
| 16 Apr 2026 11:00 | 27 Apr 2026 04:45 | 10 days | longer outage |
| 2 Apr 2026 09:00 | 11 Apr 2026 20:45 | 9 days | longer outage |
| 14 Mar 2026 06:00 | 23 Mar 2026 03:00 | 8 days | longer outage |
| 6 Mar 2026 20:15 | 9 Mar 2026 03:15 | 2 days | |
| 22 Feb 2026 00:30 | 6 Mar 2026 03:30 | 12 days | longer outage |
| 16 Jan 2026 02:15 | 19 Jan 2026 03:30 | 3 days | |
| 31 Dec 2025 19:30 | 6 Jan 2026 03:30 | 5 days | |
| 8 Dec 2025 20:15 | 23 Dec 2025 23:45 | 15 days | long outage |
A unit is stopped when its output falls to 2% of its maximum power or less (at least 5 MW); breaks shorter than an hour are merged. Maximum power is the highest output observed in the last 12 months. Scale: 7–13 days is a longer outage, 14–29 days a long one, 30 days or more a very long one.